HARVEST PRESBYTERIAN CHURCH PROJECTS
IMG_20220313_090748503_HDR.jpg
projects-png-7-Transparent-Images.png
Sunday December 5, 2021
There are many tasks needed to have the church building completed. They can be categorized by individual projects. In the sanctuary: Windows and doors are priority. Plastering of walls and ceiling. Upper room: There is a leakage in the ceilings when it rains. The zinc roof is a bit low on the sides wasting some space and making the entire area hot. Ceilings are needed. Presently, the church has electricity, water and sewage facilities. A fence is available from past teams assisting the church.
Caution-strip.png
PRIORITY PROJECTS AS OF MARCH 2022
As of today, March 13, 2022. Harvest Presbyterian Church in Calcutta, Corozal.
Presently there are two gates which are not properly built. A small gate at the front for visitors. A piece of chain link was just stretched to cover the opening and tied in place with wire, not ideal but at least keeps out something. Another gate, a wider gate on the far side of the church for trucks to unload construction material or when large cargo is brought in. Similarly, it is not properly built! chain link is stretched to cover the wide opening to provide security to the church.
As of today, March 13, 2022. Harvest Presbyterian Church in Calcutta, Corozal.
This is the only portion of the fence that is insecure. The present condition as you can see provides very little protection from animals and intruders. The wooden posts are rotten, the chain link is rusty and breaking apart.  Logs are placed at the bottom to keep it closed and it has been tied to the ground to keep it secured.
As of today, March 13, 2022. Harvest Presbyterian Church in Calcutta, Corozal.
Presently, we have been using the sanctuary for church services as it is, without doors and windows! Chairs, tables and equipment needs to be brought out and taken back every time we have church service for safe-keeping. Also, we have been using tarp to block the sun while having services. We have had people sneaking inside at night. Our utmost priority is to install all doors and windows.